AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Instal the new for mac Tails of Iron4/11/2024 ![]() ![]() Magaldi received the order to install its dry ash handling system on Unit #3 (600 MWe).Īfter the Fukushima Daiichi nuclear disaster, all Japanese nuclear power plants were closed for safety reasons. One of the world’s most efficient coal-fired power plants. Magaldi provided a turn-key solution for bottom ash removal, from the boiler terminal points up to the discharge into open trucks, including electrical equipment, steel support structures and the BA storage silo. The first MAC ® system is fully operational since July 2018, the second one was installed in September while the start-up for the remaining two systems was respectively performed in November 2018 and January 2019. ![]() In recent years, Colombia faced its most challenging energy crisis due to catastrophic effects procured by “ El Niño” phenomenon, which led to extreme drought and undermined the stability of the Country’s energy supply. To cope with this emergency, the Customer decided to retrofit the existing wet system with a more dependable dry one.įour MAC ® systems were installed under units #2, #3, #4 and #5 to increase the plant dependability and generate clean energy. All generation units are based on a pulverized coal-fired (PC) boilers configuration. The Power Plant has a total installed generation capacity of 236 MWe: unit #2 is designed for a gross electrical output at a nominal load of 38 MWe while units #3, #4 and #5 have a gross electrical output of 66 MWe each. ![]()
0 Comments
Read More
Leave a Reply. |